Project Overview
The North Sheridan Interchange Project is a joint project between WYDOT and the City of Sheridan for reconstruction of North Main Street and reconstructing a new interstate diamond interchange. The project is located in Sheridan, Wyoming from Fort Road to the Sheridan Marginal/ I-90 Interchange. The City is wanting to install two new storm treatment systems, replace leaking and undersized storm drain systems, and replace an old, infiltrating sanitary sewer system within the project limits. The sanitary sewer system is in need of replacement due to old and deteriorated sanitary sewer mains, manholes and services that are allowing infiltration into the system within the project limits. The sanitary sewer system will also expand to an area that has septic systems adjacent to Goose Creek. The project includes installing approximately 1,090 feet of 8″ PVC sanitary sewer mains and installing new 8″ sanitary sewer mains to help alleviate up to 10 septic systems that are currently in use with residences adjacent to Goose Creek. The project also includes installing approximately 10,000 linear feet of storm drain and 2 new treatment systems for storm water.
This project is planned to be completed in 2019.
Project Construction Update:
The project is winding down and public meetings are no longer being held. Please contact Nathan Rager with the City of Sheridan at [email protected] (307)265-4236, Jerry Buckley with WYDOT at [email protected] (307)674-2326, or Laura Dalles with WYDOT at [email protected] (307)674-2356
North Main Street:
- Fort Rd and 17th Street are now open. Temporary paving is in place for now. Permanent paving and realignment will be done once right-of-way negotiations are resolved.
- North Main Street traffic flow will run down the center three (3) lanes. Outside lanes are closed while lighting and landscaping is being completed.
- Reduced speed limit of 20 MPH remains in place through the work zone.
- the pathways north of Goose Creek remain closed to pedestrians until further notice.
I-90 Eastbound
- Paving is underway. Watch for increased construction traffic, short delays, and detours.
- The 14-foot width restriction remains in effect.
- The City of Sheridan No Engine Break Ordinance is in place.
Thank you for your patience and cooperation.
**All schedules are dependent upon weather
For additional information and project updates, please visit WYDOT's North Sheridan Interchange webpage at: http://www.dot.state.wy.us/northsheridan

North Sheridan Interchange Project Construction Videos
N. Main Street Time Lapse Construction Video - North Sheridan Interchange Project
Anticipated Work Zone Map
I-90 Construction Map
Additional updates are provided by Laura Dalles of WYDOT, and can be accessed through the WYDOT's North Sheridan Interchange project Facebook page.
Project Visuals